无码人妻精品一区二区三区久久久,鲁和美女的黄色一级大片,亚洲成色精品一区二区三区,国产女孩秀大逼

Home > Cement Design and Research Institute > Project Business > Project Contracting
Project Business

Tailored Solutions

Date:2020-05-22 10:52 Number: Size:[ Big ] [ Middle ] [ Small ]

We provide tailored solutions based on our know-how, in order to help our clients increase their production output, decrease operating cost and reduce environmental impact :

1. Increase capacity and Efficiency
Pre-heater, calciner and kiln design
Grinding system design
    
2. Minimize Emissions
Dust control system design
Selective Non-Catalytic (SOx and NOx) Reduction (SNCR)

3. Recycling of Wastes
Waste heat recovery
Alternative Fuels
Non-hazardous treatment of sludge, hazardous wastes, solid waste

4. Full Flowsheet Optimization
Process Optimization
DCS, PCS and Intelligence Control
National Testing Center (Physical tests, chemical tests, full-flowsheet heat/water/power balance tests, emission tests, national/industry standard drafting, project acceptance and evaluation)

    Share to:
韩城市| 颍上县| 融水| 尚志市| 托克逊县| 防城港市| 赣州市| 昭苏县| 汝南县| 临潭县| 河东区| 邢台市| 九寨沟县| 秦安县| 天台县| 东海县| 兖州市| 四川省| 江达县| 毕节市| 蓬安县| 尉氏县| 寿宁县| 哈尔滨市| 临沭县| 武夷山市| 同江市| 乐至县| 商城县| 依安县| 忻城县| 桦川县| 噶尔县| 巴彦县| 始兴县| 皮山县| 阿城市| 得荣县| 青神县| 九寨沟县| 宾川县|